Casino Cristal

Additional information

Area: Construction market
Client: Casino Cristal Gdańsk (Poland)
Project duration:
Reconstruction of the building 2011,
Arrangement of space for the purposes of Casino 2012
Scope of work: Adaptation of the building in the design – build system; area: 2500 m

Project description:

In 2014 adaptation of the building for the needs of the Cristal Casino in the design-build system in the scope of the building part, interior furnishings with equipment (except gaming machines), furniture and bar buildings. As part of the project, the following installations were made: sanitary, ventilation, electric and teletechnical.
The works were carried out in a three-shift system to meet a busy work schedule.