Royal Carribben Cruises – CELEBRITY EDGE – J-34

About

Business: Maritme Market
Client: Pier Marine GmbH/STX Shipyard
Time frame: 10.2017-10.2018
Project Scope: technical advisory and installation of the integrated interior works in Art Gallery, Photo Gallery, Retail, Concierge Room

PENTA company carried on works on passenger crusies J-34 (Celebrity Edge) build in STX Shipyard in France. The vessel is a part of EDGE project realized for Royal Caribbean Cruises. The new Edge class ships will be a totally new vessel for the cruise line at 117,000 gross tons. The ships will have a passenger capacity of 2,900. The 2,900-passenger vessels will build upon modern luxury experience of Millennium- and Solstice-class vessels.

Celebrity Edge – total price of order: 875 mln USD.

Celebrity Edge got 2018 Best New Ship Award.

The PENTA’s scope of work included technical advice and installation of the integrated works on Art Gallery, Photo Gallery, Retails, Concergie Room.

Scope o work:

  • All traces and installation of all structures and reinforcements (steel and aluminium).

  • All coatings and ceilings tracing, regardless of material.

  • All traces of electrical elements on the floor and ceiling, whatever the materials.

  • All elements welded to the ship’s steel structures (and silent-blocks if necessary)

  • All ceiling reinforcements and partitions.

  • All steel and aluminum structures necessary for the use of partitions and ceilings, whatever the materials.

  • All decorative wall coverings (Mapac, Novaship or Siniat) as well as technical doors and doors.

  • All drilling and cutting required for cables and electrical equipment.

  • All doors B0, glass doors and bay windows.

  • All decorative partitions and showcases.

  • All profiles, finishing angles and skirting boards.

  • All flexible and hard joints around portholes and decorative elements.

  • Any decorative backlight systems and other decorative ceiling ceiling elements.

  • All supply furniture.

  • All installation of steel kitchen in the Hot Galley (including installation all stainless steel furniture)

  • Any assistance to the electrician regarding cable positions and cable outlets.

  • All decorative panels and ceiling hatches.

  • All the cabinets

  • All soil thresholds

The work was completed in October, 2018.

Gallery: